Feed in Tariff Rates
Malaysia Feed in Tariff Rates depends on various factors. Such factors are:
- The type of RE technology used (whether it’s a small hydro, biogas, biomass, or solar PV)
- Capacity of the RE technology used
- RE installation commencement date
- Whether the RE technology has met any criteria that entitles for an additional bonus FiT rate
Solar PV FiT Rates:
FIT Rates for Solar PV (21 years from FIT Commencement Date)
Description of Qualifying Renewable Energy Installation | FiT Rates (RM per kWh) | |
---|---|---|
(A) Basic FiT rates having installed capacity of : | 2013 | 2014 |
(i) up to and including 4kW | 1.1316 | 1.0411 |
(ii) above 4kW and up to and including 24kW | 1.1040 | 1.0157 |
(iii) above 24kW and up to and including 72kW | 0.9440 | 0.7552 |
(iv) above 72kW and up to and including 1MW | 0.9120 | 0.7296 |
(v) above 1MW and up to and including 10MW | 0.7600 | 0.6080 |
(vi) above 10MW and up to and including 30MW | 0.6800 | 0.5440 |
(B) Bonus FiT rates having the following criteria (one or more) : | 2013 | 2014 |
(i) use as installation in buildings or building structures | +0.2392 | +0.2201 |
(ii) use as building materials | +0.0300 | +0.0300 |
(iii) use of locally manufactured or assembled solar PV modules | +0.0100 | +0.0099 |
(iv) use of locally manufactured or assembled solar inverters | +0.0100 | +0.0100 |