In order to guarantee fairer share, SEDA Malaysia has capped the RE Installation capacities, particularly for Solar PV, for different categories. Capping is putting a quota or a limit for 6 months time period for the next 3 years. This 6-month time frame is the period allotted should there be next available set of quotas. The following tables show RE Quota for Solar PV Installation :

Available MW Capacity for FiT Application 2013 2014
H1 H2 H1 H2
Housing Developer 0.00 0.00 0.00 0.00
Individual 2.86 1.99 0.00 0.00
Non-individual (<500kW) 0.00 0.00 0.00 0.00
Non-individual (>500kW) 0.00 0.00 0.00 0.00
Allocated MW Capacity 2013 2014
H1 H2 H1 H2
Housing Developer 0.00 0.00 0.00 0.00
Individual 4.70 0.47 0.00 0.00
Non-individual (<500kW) 1.98 1.30 0.72 0.00
Non-individual (>500kW) 32.26 26.24 30.53 0.00